Zone d'identification
Cote
Titre
Date(s)
- 1983 (Production)
Niveau de description
Pièce
Étendue matérielle et support
1 page : ill. ; 0.01 GB
Zone du contexte
Nom du producteur
Notice biographique
Histoire archivistique
Source immédiate d'acquisition ou de transfert
Zone du contenu et de la structure
Portée et contenu
Évaluation, élimination et calendrier de conservation
Accroissements
Mode de classement
Zone des conditions d'accès et d'utilisation
Conditions d’accès
Conditions de reproduction
Copyright: BCIT; expiry unknown
Langue des documents
Écriture des documents
Notes de langue et graphie
Caractéristiques matérielle et contraintes techniques
Instruments de recherche
Zone des sources complémentaires
Existence et lieu de conservation des originaux
Metadata not sufficient to connect scan to original. 2020-02-24.
Existence et lieu de conservation des copies
Unités de description associées
Zone des notes
Note
About the building: On May 3, 1983, the Welding Training Centre Building is officially opened by Hon. C. Stephen Rogers, Minister of Environment, Hon. Grace McCarthy, Minister of Human Resources, and Elwood Veitch, PVI Executive Director. Constructed at a cost of $2,461,600, the building was designated as the a component of the three-building Steel Industries Training Centre complex, Pacific Vocational Institute. (In 1981, Waisman, Dewar, and Grout, Architects are chosen for the new welding centre.)
General: The NE8 building , is located at 3700 Willingdon Avenue Burnaby, BC. 2,395 SM of space. The facility is composed of a one level building with mezzanino used for classroom, office and storage.
Substructure: The substructure construction of the building features concrete perimeter foundation walls on reinforced concrete footings. The facility has a concrete slab on grade.
Superstructure: The building has both load bearing CMU’s wall construction and steel columns and steel frame with concrete filled steel pan for the mezzanine floor framing and sloped steel open web joist with steel decking for roof framing.
Exterior Construction: Exterior walls at NE8 building includes metal cladding finishing’s construction. Exterior windows are double glazed metal framed assemblies. Entry doors are typically either glazed / unglazed hollow metal assemblies. The roof includes sloped metal roof system covering and adhered SBS modified roofing membrane covering.
Interior Construction Floor finishes throughout the facility are vinyl composite tiles, ceramic tiles and concrete floor. Restrooms/change rooms generally have ceramic tiles walls finish. Wall finishes are painted gypsum wallboard and painted block. The ceiling finishes are generally 600 x 1200 ACT or no finish (open to roof structural components). The interior doors are finished metal assemblies, some with glazed panels. Interior door hardware is typically a combination of knob with panic hardware where required at exterior door fire exit locations.
Occupancy Type According to the 2006 British Columbia Building Code, Article 3.1.2.1. (1), the NE8 building is classified as an Assembly Group A, Division 2 occupancy.
Identifiant(s) alternatif(s)
Drawing no.
Mots-clés
Mots-clés - Sujets
Mots-clés - Lieux
Mots-clés - Noms
Mots-clés - Genre
Zone du contrôle de la description
Identifiant de la description
Règles et/ou conventions utilisées
Statut
Niveau de détail
Dates de production, de révision, de suppression
C. McLellan, created 2020-02-24
Langue(s)
Écriture(s)
Sources
Objet numérique - métadonnées
Nom du fichier
NE08__formerly_Bldg_20.pdf
Latitude
Longitude
Type de support
Texte
Type MIME
application/pdf